Obese Dump Truck Left Gap in Lined Bridge When It Crashed Into River

0
14
Obese Dump Truck Left Gap in Lined Bridge When It Crashed Into River

The driving force of a dump truck realized the laborious method that it’s finest to not tempt destiny on a coated bridge initially constructed earlier than the Civil Struggle.

The loaded car crashed into the Presumpscot River on Friday afternoon, leaving a gap within the planks within the form of the truck.

The driving force suffered minor accidents, police mentioned, however the identical couldn’t be mentioned for Babb’s Bridge, which was initially in-built 1840 and rebuilt in 1976 after a hearth. One of the best-case situation is the bridge shall be closed for a couple of months, officers mentioned.

The load restrict on the bridge was 3 tons (2,700 kilograms), and the dump truck carrying crushed stone was “a number of instances that,” mentioned Paul Merrill, spokesperson for the Maine Division of Transportation.

The truck was crossing from Gorham into Windham when it plummeted into the water. The Gorham Police Division mentioned the mishap stays underneath investigation. The driving force didn’t reply to messages from The Related Press.

PHOTO: A gap is seen after a loaded dump truck plummeted by way of the planks of the coated Babb’s Bridge into the Presumpscot River in Gorham, Maine, on Friday, Aug. 23, 2024. (Gorham Police Division through AP)

Copyright 2024 Related Press. All rights reserved. This materials is probably not revealed, broadcast, rewritten or redistributed.

Subjects
Auto

Was this text priceless?


Listed below are extra articles you could get pleasure from.

Serious about Auto?

Get computerized alerts for this matter.

LEAVE A REPLY

Please enter your comment!
Please enter your name here